Top Fencing Companies in Sherwood, OR, 97140 | Compare & Call

There are 186 fencing companies server in Sherwood OR

Ermini Construction

Ermini Construction

Portland OR 97267
General Contractors, Fences & Gates, Decks & Railing

Ermini Construction LLC, based in Portland, OR, is a licensed, bonded, and insured general contractor (CCB#252806) specializing in transforming houses into personalized homes. With a focus on remodeli...

S & S Pacific NW

S & S Pacific NW

Molalla OR 97038
Siding, Decks & Railing, Fences & Gates

S & S Pacific NW is a licensed and insured exterior construction company serving homeowners and contractors in Molalla, Oregon, and the surrounding Pacific Northwest. We specialize in siding installat...

Proper Built

Proper Built

Portland OR 97233
Decks & Railing, Siding, Fences & Gates

Proper Built serves Portland, OR, specializing in decks, railing, siding, fences, and gates. With Portland's damp climate, wood structures often suffer from rot and warping. Proper Built addresses the...

A Better Handyman

A Better Handyman

Oregon City OR 97045
Fences & Gates, Handyman, Decks & Railing

A Better Handyman serves Oregon City, OR and the greater Portland metro area with over a decade of experience in deck construction, repair, and replacement. We understand that your home is central to ...

Alpha Fencing Company

Alpha Fencing Company

★★★★★ 5.0 / 5 (1)
17942 SE Division St, Portland OR 97236
Fences & Gates

Since 1988, Alpha Fencing Company has provided quality fencing for residential, commercial, and industrial clients across the Portland metro area. We specialize in installing chain link, wood, vinyl, ...

JJ’S Home Improvements

JJ’S Home Improvements

Tualatin OR 97062
General Contractors, Landscaping, Fences & Gates

JJ’S Home Improvements, based in Tualatin, Oregon, is a full-service general contractor and landscaping company. We bring years of experience in both home remodeling and landscape construction to ever...

« Previous PagePage 19 of 19Next »


Estimated Fencing Costs in Sherwood, OR

Emergency Fence/Gate RepairStorm / Security Response
$274 - $369
Wood Privacy Fence (Per LF)Estimated Range
$24 - $39
Vinyl / PVC Fencing (Per LF)Estimated Range
$34 - $54
Chain Link Installation (Per LF)Estimated Range
$14 - $24
Aluminum / Ornamental (Per LF)Estimated Range
$39 - $59
Standard Driveway Gate InstallEstimated Range
$984 - $1,314

Methodology: Estimates are dynamically generated using localized construction labor multipliers derived from 2025 BLS OEWS (SOC 47-4031) data for Sherwood. Prices reflect standard commercial/residential material specs and labor options adjusted for 2026 economic projections.

Frequently Asked Questions

Why do fence posts in Sherwood's Old Town neighborhood fail prematurely, and what's the correct installation method?

Structural failure occurs when posts are not set below the frost line. Sherwood's frost line depth is 18 inches. Posts set in shallow concrete will lift from frost heave, breaking the footing. IRC R403.1.4 requires footings to extend a minimum of 12 inches below undisturbed earth and below the frost line. For stability in Old Town, we set posts 24 inches deep with a 12-inch diameter concrete footing to resist both frost and the 105 MPH V-ult wind load.

What are my legal obligations to my neighbor before replacing a shared fence in Sherwood?

Oregon's 'good neighbor' law (ORS 96.010) creates specific duties for shared boundary fences. In Sherwood, you must provide written notice to all adjoining property owners at least 30 days before construction begins on a partition fence. The 2026 legal standard includes sending notice via certified mail and providing design specifications. Failure to comply can result in liability for the full cost and potential civil action to remove the new structure.

What are the height and placement rules for a fence on my Sherwood property?

Sherwood zoning enforces a 4-foot height limit in the front yard setback and a 6-foot limit in rear and side yards. The setback regulation is 0-foot, meaning you can build directly on the property line with proper notice. For corner lots, especially those near OR-99W, a critical 'sight triangle' must be maintained. No structure over 3 feet tall is permitted within 20 feet of the intersection corner to preserve driver visibility and meet city traffic safety codes.

How is my fence designed to withstand Sherwood's high winds?

The design is governed by the 105 MPH V-ult wind speed rating per ASCE 7-22 standards. This 'ultimate design' wind speed dictates post spacing, concrete footing size, and bracket strength. For a standard 6-foot privacy fence, we reduce post spacing to 7 feet on-center and use 6x6 posts with seismic/post brackets embedded in concrete. This configuration survives peak storm season gusts, particularly in areas with higher exposure, such as properties near Stella Olsen Memorial Park.

How soon can a project start, and what is the consultation process?

We typically schedule consultations within 3-5 business days. For a site visit in Old Town, our route originates near Stella Olsen Memorial Park, proceeds via OR-99W, and arrives within the 25-35 minute response window. The consultation includes a zoning verification, site measurement, and soil assessment. Following the visit, a formal quote and projected start date—contingent on Oregon 811 clearance and permit issuance—are provided within 48 hours.

What is required before digging fence post holes in the Old Town neighborhood?

You must contact Oregon 811 for a utility locate at least two business days before excavation. Hitting a gas, water, or fiber optic line in Old Town is a major liability, incurring repair costs and fines. We manage the entire process, including pulling the required city permit from the Sherwood Permit Office. The permit application requires a site plan showing the fence location relative to property lines and structures, which we prepare and submit.

Can I install an automatic gate for my pool area that meets current Oregon safety codes?

Yes, but integration is key. The pool barrier must comply with IBC Section 3109 and ASTM F1908, which mandate self-closing, self-latching gates with latches 54 inches above grade. The moderate smart-gate trend in 2026 involves IoT-enabled openers that integrate with this hardware. The system must log access attempts and send real-time alerts if the gate is propped open, creating a verifiable record to meet modern liability standards for Oregon homeowners.

Which fence materials and fasteners are suitable for Sherwood's soil and pest conditions?

Material compatibility is dictated by the moderate soil corrosivity index and moderate termite risk. Pressure-treated Southern Yellow Pine is a standard, but all fasteners must be G90 galvanized steel or stainless steel to prevent rust streaks. For cedar or composite, use only coated or stainless screws. Avoid steel posts in direct ground contact unless hot-dip galvanized. These specifications prevent premature decay and meet the structural demands of the local environment.



Scroll to Top
CALL US NOW